Files
myasnikovdaniil cc44f6c981 ci(release): move release validation to rc time — e2e lane, changelog button, promote gate, docs at promote (#3449)
## What this PR does

Moves release validation from promote time to rc time, making promotion
itself a pure retag operation. This is the follow-up to the v1.6.0
retrospective: the promote flow's checks ran on the promote PR (coupled
to promotion, skippable by never promoting), the changelog and website
docs were produced only after the release went public, and the finalize
tag push silently failed to trigger `tags.yaml` at all
(persisted-credential bug, root-caused below).

The release lifecycle after this PR:

1. `cut-prerelease.yaml` cuts an rc; `tags.yaml` builds, drafts, pushes
the staging branch — and now runs a **mandatory full e2e** for every
`-rc.N` tag via the new reusable `e2e-tag.yaml` lane. Alpha/beta (and
any published tag) get the same validation as a **manual button**
(`workflow_dispatch`).
2. Optionally, a maintainer presses the **`changelog-rc.yaml` button**:
the release changelog is generated from the rc tag (reusable
`changelog-generate.yaml`) and committed to the rc staging branch, ready
for review long before promotion.
3. `promote-rc.yaml` dispatch is **gated on green rc e2e** (evidence:
the rc's `tags.yaml` run containing a successful `rc-e2e` job, or a
successful manual `e2e-tag` dispatch for the tag; `skip_e2e_gate` input
for emergencies, always surfaced in the PR body as ✅/⚠️). Promote stages
the release, picks up the rc-time changelog (or generates one), and
**opens the website docs PR** on cozystack/website from the staging
branch — parked with an explicit DO-NOT-MERGE-until-finalize contract.
4. The promote PR **no longer gets `full-e2e` automatically** — its tree
is the rc's already-validated digests with only tag strings rewritten; a
maintainer can still add the label manually to force the suite.
5. Finalize performs the irreversible side effects (tag, publish, retag,
chart) — and with `persist-credentials: false` its tag push now actually
authenticates as the CI app, so the `tags.yaml` backstops
(`generate-changelog`, `update-website-docs`) fire for promoted tags.
This is the one-line fix for the v1.6.0 incident where the tag triggered
nothing: the checkout's persisted `GITHUB_TOKEN` `http.extraheader`
silently defeats the app token injected via `git remote set-url`, and
`GITHUB_TOKEN` pushes create no workflow runs.

Everything is pinned by executable contract tests
(`hack/promote-gate-contract.bats`, extended
`hack/release-changelog-contract.bats` /
`release-changelog-behaviour.bats` — 48 tests total, including behaviour
tests that execute the new `hack/parse-rc-tag.sh` and
`hack/select-changelog-source.sh` for real), and `docs/release.md` is
rewritten to describe the new lifecycle end-to-end.

### Commit map (review commit-by-commit)

- `75b5192f1`…`dd308644c` + `6fc970851` — the pre-existing
changelog-before-publication rework (changelog generated at promote,
committed to the staging branch before the PR opens, finalize publishes
it as the release body; tags.yaml job becomes a verbatim-port backstop),
rebased onto main.
- `5aec70b3a` — `e2e-tag.yaml`: reusable published-tag e2e lane
(prerelease → staging branch, stable → tag; draft releases fail fast;
dispatch-only SSH `debug` breakpoint; tag-suffixed artifacts).
- `025564d96` — `tags.yaml::rc-e2e`: mandatory full e2e for freshly cut
rc tags (also on `release_exists` re-runs); fixes the
`cut-prerelease.yaml` comment that falsely claimed e2e already existed.
- `2dfbeea77` — `changelog-generate.yaml` (reusable core) +
`changelog-rc.yaml` (rc-time button committing to the staging branch);
promote-rc gains a top-level `parse` job with a strict no-whitespace tag
policy (`hack/parse-rc-tag.sh`); source selection is
validate-then-fallthrough (`hack/select-changelog-source.sh`) so an
invalid higher-priority changelog can never silently win.
- `ff7ddd3c9` — the promote e2e gate + `skip_e2e_gate` override +
removal of the automatic `full-e2e` label (pull-requests.yaml
release-path e2e now requires an explicit label; a post-open label now
actually starts the run).
- `936190d4b` — `website-docs` job at promote time behind a
FETCH_REF-support guard (see dependency below), with the
DO-NOT-MERGE-until-finalize contract and a pin-freshness pass before
`release-next`; `tags.yaml::update-website-docs` stays as the backstop.
- `01e1e7188` — the `persist-credentials: false` finalize fix (v1.6.0
root cause).
- `717c8860f` — `docs/release.md` coherence pass over the whole new
lifecycle.

### Dependency

The promote-time website docs job needs cozystack/website#631
(`FETCH_REF` + fail-loud fetch). Until that merges, the job's guard
detects the missing support and degrades to a ⚠️ line in the promote PR
body — promotion is unaffected and the tag-time backstop backfills, so
this PR is safe to merge first.

### Merge instructions

Please **merge-commit, do not squash**: the 13 commits are deliberately
atomic (the credential root-cause fix is separable from the feature
work) and squashing would collapse ~3k lines into one commit, hurting
bisectability.

### First live run

The e2e lane is verified by lint, contract tests and dry-traces, but has
not yet executed against a real tag; the intended first live run is a
manual `e2e-tag.yaml` dispatch against an existing published rc tag
before the gate is relied on for a real promotion.

### Release note

```release-note
NONE
```


<!-- This is an auto-generated comment: release notes by coderabbit.ai
-->
## Summary by CodeRabbit

* **New Features**
* Added reusable changelog generation with validation, “present”
signaling, and safe artifact upload behavior (including RC-time
support).
* Added an E2E release-tag workflow with tag parsing, deterministic
sandboxing, and comprehensive report collection.
* Improved RC promotion with a stricter parse front-door, verified E2E
green gate (optional bypass), and earlier parallel changelog/asset
staging.
* **Documentation**
* Refreshed release-process docs to match the updated RC-to-stable,
changelog, and website-docs timing rules.
* **Bug Fixes**
* Improved PR finalization to source release bodies from verified
changelogs and warn/fallback on missing or empty content.
* Tightened label gating so E2E runs only under the intended conditions.
<!-- end of auto-generated comment: release notes by coderabbit.ai -->
2026-07-29 17:14:29 +05:00
..