Files
cozystack/docs/release.md
T
Aleksei Sviridkin f3223c33d3 ci(e2e): run nightly and release-tag e2e on the container lane
Nightly and the rc gate still booted the management nodes as QEMU
guests, the substrate the merge-gating lanes left behind. On it the
tenant Kubernetes suites have missed their node-join deadline on most
nights since 2026-10-02, each failure spends the whole deadline, and
the job reaches its timeout before the alphabetically later suites
run. Over the same days those suites passed on every PR run that
selected them, where the nodes are Talos containers and a tenant
worker sits one virtualization level shallower.

Both lanes now use the PR lanes' container substrate. Nightly's e2e no
longer waits for the nocloud disk, which it does not boot; the disk is
still built and published. A manual e2e-tag dispatch against a tag
that predates the container lane fails early and names the ref to
dispatch from instead.

DRBD, the replicated StorageClass and the Cozystack Talos node image
lose their last e2e coverage with this. The docs and comments that
pointed at nightly and the rc gate as that coverage now say so.

Assisted-by: LLM
Signed-off-by: Aleksei Sviridkin <f@lex.la>
(cherry picked from commit da28ea7ee8)
Signed-off-by: Myasnikov Daniil <myasnikovdaniil2001@gmail.com>
2026-10-13 20:09:26 +05:00

48 KiB
Raw Blame History

Release Workflow

This document is both the process design (what the release model looks like) and the operational playbook (what to actually do, what breaks, what to verify). Companion to agents/changelog.md, which is the canonical changelog process.

When to use this guide

You are about to:

  • Cut a pre-release (vX.Y.0-rc.N, or vX.Y.0-alpha.N / -beta.N).
  • Cut a regular release (vX.Y.0).
  • Cut a patch release (vX.Y.Z with Z > 0).
  • Triage cherry-picks before a patch release.
  • Investigate why CI is misbehaving on a tag push.
  • Review a Prepare release PR.

If you are about to generate a changelog only, jump straight to agents/changelog.md.

Introduction

Cozystack uses a staged release process to ensure stability and flexibility during development.

There are three types of releases:

  • Release Candidates (RC) – Preview versions (e.g., v1.2.0-rc.1) used for final testing and validation.
  • Regular Releases – Final versions (e.g., v1.2.0) that are feature-complete and thoroughly tested.
  • Patch Releases – Bugfix-only updates (e.g., v1.2.1) made after a stable release, based on a dedicated release branch.

All three are matched by tags.yaml's regex ^v\d+\.\d+\.\d+(-(alpha|beta|rc)\.\d+)?$. The tag push is the trigger for the whole pipeline. Pre-release tags (-alpha / -beta / -rc) are cut with the Cut Pre-release Tag workflow (manual dispatch from main or release-X.Y) — it pushes the tag as the CI app at the dispatch branch's tip, so GitHub fills base_ref (tags.yaml's Get base branch step refuses tags pushed without a base) and the push triggers tags.yaml (a tag pushed with the default GITHUB_TOKEN would not). Stable vX.Y.Z tags are never pushed by hand at all — they are cut write-once by the promote flow at a PR merge commit.

Release Candidates

Release candidates are Cozystack versions that introduce new features and are published before a stable release. Their purpose is to help validate stability before finalizing a new feature release. They allow for final rounds of testing and bug fixes without freezing development.

Release candidates are given numbers vX.Y.0-rc.N, for example, v1.2.0-rc.1. They are created directly in the main branch. An RC is typically tagged when all major features for the upcoming release have been merged into main and the release enters its testing phase. However, new features and changes can still be added before the regular release vX.Y.0.

Each RC contributes to a cumulative set of release notes that will be finalized when vX.Y.0 is released. After testing, if no critical issues remain, the regular release (vX.Y.0) is tagged from the last RC or a later commit in main. This begins the regular release process, creates a dedicated release-X.Y branch, and opens the way for patch releases.

Regular Releases

A regular release vX.Y.0 is promoted from a release-candidate that already passed e2e — never tagged by hand and never rebuilt. The bytes shipped as vX.Y.0 are the exact vX.Y.0-rc.N images, retagged by digest. We'll use v1.2.0 as an example.

gitGraph
    commit id: "feature"
    commit id: "feature 2"
    commit id: "feature 3" tag: "v1.2.0-rc.1"

A regular release sequence runs as follows:

  1. Cut a release candidate (v1.2.0-rc.N) from the last good commit on main: run the Cut Pre-release Tag workflow (manual dispatch from main) with the tag. It tags main's HEAD as the CI app; tags.yaml then builds the rc images, drafts the rc release, and pushes the digest-vendored release-1.2.0-rc.N staging branch.

  2. Validate the rc. New features and fixes can still land on main and be picked up by a later rc.

  3. Once an rc is green, run the promote-rc.yaml workflow (manual dispatch) with that rc tag. Promotion is transactional — it performs no registry mutation at dispatch. It:

    1. Pushes the release-1.2.0 branch: the rc's digest-vendored tree with the rc version substring rewritten to 1.2.0 (the digests are the rc's — unchanged).
    2. Drafts the v1.2.0 release and uploads the (restamped) assets.
    3. Opens the chore(release): promote v1.2.0-rc.N -> v1.2.0 PR into main, labelled release and full-e2e (the latter forces the full e2e suite on the PR). The retag itself is deferred to the merge (step 5) — so an abandoned promotion leaves no stable-named images and cannot wedge a re-promotion.
    gitGraph
        commit id: "feature"
        commit id: "feature 2"
        commit id: "feature 3" tag: "v1.2.0-rc.1"
        branch release-1.2.0
        checkout release-1.2.0
        commit id: "Prepare release v1.2.0"
        checkout main
        merge release-1.2.0 id: "Pull Request"
    
  4. Maintainer reviews the PR and the draft release, then merges it — do not squash-merge, the stable tag must attach to a real merge commit. GitHub removes the merged branch release-1.2.0 (the repo has auto-delete-on-merge enabled).

  5. CI workflow triggers on merge (this is where every irreversible side effect happens, all after the PR's e2e passed):

    1. Creates the tag v1.2.0 at the newly created merge commit — write-once. The tag is published here for the first time, never moved.
    2. Cuts the write-once api/apps/v1alpha1/v1.2.0 Go-module tag at the same commit.
    3. Ensures the release-1.2 maintenance branch exists at the tag commit.
    4. Publishes the release page (draft → latest).
    5. Retags the rc's images by digest to v1.2.0 (and :latest only when v1.2.0 is the newest published stable), and publishes the stable cozy-installer chart — no rebuild.
  6. The maintainer can now announce the release to the community.

gitGraph
    commit id: "feature"
    commit id: "feature 2"
    commit id: "feature 3" tag: "v1.2.0-rc.1"
    branch release-1.2.0
    checkout release-1.2.0
    commit id: "Prepare release v1.2.0"
    checkout main
    merge release-1.2.0 id: "Release v1.2.0" tag: "v1.2.0"

Patch Releases

Making a patch release has a lot in common with a regular release, with a couple of differences:

  • The rc and its promotion happen on the release-X.Y maintenance branch instead of main.
  • Patch commits are cherry-picked to that branch before the rc is tagged.

Let's assume that we've released v1.2.0 and that development is ongoing. We have introduced a couple of new features and some fixes to features that we have released in v1.2.0.

Once problems were found and fixed, a patch release is due.

gitGraph
   commit id: "Release v1.2.0" tag: "v1.2.0"
    checkout main
    commit id: "feature 4"
    commit id: "patch 1"
    commit id: "feature 5"
    commit id: "patch 2"
  1. The maintainer creates a release branch, release-1.2, and cherry-picks patch commits from main to release-1.2. These must be only patches to features that were present in version v1.2.0.

    Cherry-picking can be done as soon as each patch is merged into main, or directly before the release.

    gitGraph
        commit id: "Release v1.2.0" tag: "v1.2.0"
        branch release-1.2
        checkout main
        commit id: "feature 4"
        commit id: "patch 1"
        commit id: "feature 5"
        commit id: "patch 2"
        checkout release-1.2
        cherry-pick id: "patch 1"
        cherry-pick id: "patch 2"
    

    When all relevant patch commits are cherry-picked, the branch is ready for release.

  2. The maintainer cuts a release candidate (v1.2.1-rc.N) via the Cut Pre-release Tag workflow (manual dispatch from release-1.2), which tags that branch's HEAD. CI builds the rc images, drafts the rc release, and pushes the release-1.2.1-rc.N staging branch.

  3. Validate the rc.

  4. Once the rc is green, run promote-rc.yaml (manual dispatch) with that rc tag. It pushes the release-1.2.1 branch (rc digests, tag string rewritten to 1.2.1), drafts the v1.2.1 release with the restamped assets, and opens the promote PR into release-1.2 (labelled release + full-e2e). As with a regular release the retag is deferred to the merge — no registry mutation at dispatch.

    gitGraph
        commit id: "Release v1.2.0" tag: "v1.2.0"
        branch release-1.2
        checkout main
        commit id: "feature 4"
        commit id: "patch 1"
        commit id: "feature 5"
        commit id: "patch 2"
        checkout release-1.2
        cherry-pick id: "patch 1"
        cherry-pick id: "patch 2" tag: "v1.2.1-rc.1"
        branch release-1.2.1
        commit id: "Prepare release v1.2.1"
        checkout release-1.2
        merge release-1.2.1 id: "Pull request"
    

    Finally, when release is confirmed, the release sequence goes on.

  5. Maintainer reviews and merges the PR — do not squash-merge. GitHub removes the merged branch release-1.2.1 (auto-delete-on-merge is enabled).

  6. CI workflow triggers on merge (all irreversible side effects, post-e2e):

    1. Creates the tag v1.2.1 at the newly created merge commit — write-once. The tag is published here for the first time, never moved.
    2. Cuts the write-once api/apps/v1alpha1/v1.2.1 Go-module tag at the same commit.
    3. Publishes the release page (draft → latest; latest moves only if v1.2.1 is the newest published stable).
    4. Retags the rc's images by digest to v1.2.1 and publishes the stable cozy-installer chart — no rebuild.
  7. The maintainer can now announce the release to the community.

What CI does during the release process

The numbered process above is implemented by five workflows. Knowing which job does what makes the failure modes much easier to diagnose.

  1. cut-prerelease.yaml — manual dispatch (from main or release-X.Y): the sole entry point for creating a pre-release tag. Validates the -alpha/-beta/-rc tag, then pushes it (write-once, at the branch tip) as the CI app so tags.yaml fires. Stable tags are never created here.
  2. tags.yaml — fires on an rc tag push: runs prepare-release, then generate-changelog, then update-website-docs.
  3. promote-rc.yaml — manual dispatch: stages the release-X.Y.Z tree (rc digests, tag string rewritten to stable), drafts the stable release, and opens the release-X.Y.Z promote PR. No registry mutation — transactional.
  4. pull-requests-release.yaml — fires when the release-X.Y.Z PR merges; finalizes the release: cuts the write-once stable + Go-module tags, publishes, then retags the rc images to stable by digest (:latest gated on newest-stable) and publishes the stable chart.
  5. update-releasenotes.yaml — fires on every push to main; syncs docs/changelogs/v*.md content into the corresponding GitHub Release body.

Phase 1 — prepare-release (hard gate)

On an rc tag push: builds images, commits digest pins, creates the draft release, and pushes the release-X.Y.Z-rc.N staging branch. (The stable promote PR is opened later by promote-rc.yaml, not here. When the stable tag itself is pushed by finalize, a draft already exists, so this job is a no-op — see Phase 5.)

The commit (Prepare release vX.Y.Z, authored by cozystack-ci[bot]) is digest pins and image tags only:

  • packages/core/{installer,platform,testing}/values.yaml
  • packages/system/*/values.yaml (cozystack-api, dashboard, kamaji, linstor, kubevirt-csi-node, etc.)
  • packages/apps/kubernetes/images/{kubevirt-csi-driver,ubuntu-container-disk-*}.tag
  • packages/system/dashboard/templates/configmap.yaml (the $tenantText value)

Things that look surprising in the diff but are normal:

  • Zero-diff packages: when buildx fully caches and upstream base images haven't moved, the digest is byte-identical to the previous release and won't appear. Verify the build step actually ran — don't assume "no diff = nothing built."
  • Sudden churn on ubuntu-container-disk-* tags: cloud-images.ubuntu.com/noble/current/ is a moving target; these often rebuild even without code changes.
  • Switched registry: if a self-built image moved from docker.io to ghcr.io, the registry portion of the digest changes — that's a deliberate move, not a regression.
  • targetVersion is NOT touched by the release PR. Platform migration targetVersion is bumped earlier in a feature commit (e.g. [platform] Bump migration targetVersion to 39 for migration 38). The release PR only re-pins the platform-migrations image digest.

Phase 2 — generate-changelog (non-blocking)

Uses a separate read-only GitHub App token (permission-contents: read, permission-pull-requests: read, permission-metadata: read) for the AI step, so the model cannot mutate the repo even with --allow-all-tools. Branch creation, commit, push, and PR creation happen in subsequent steps under a write-scoped token.

The job runs with continue-on-error: true. A green tag CI run does not imply a changelog landed — check that the changelog-vX.Y.Z PR exists with content. If it does not, follow agents/changelog.md manually.

Known reasons this phase fails silently:

  • Copilot quota exhausted (COPILOT_GITHUB_TOKEN 402). Refill or rotate. Drafts still get created by Phase 1; you have to open the changelog PR by hand.
  • AI step timeout (hard 30-min cap).
  • Output file empty — caught by the next step's [ -s ] check, fails loudly.

Phase 3 — update-website-docs

Runs with if: !cancelled() && needs.prepare-release.result == 'success' so it survives a failed or skipped changelog phase but stops when the workflow is cancelled. Decides whether to promote next/ → vX.Y/ in the website repo (only for non-prerelease tags where the version directory doesn't yet exist), runs make update-all, then stages content hugo.yaml data/versions and opens a PR against cozystack/website.

If anyone changes the website Makefile to write somewhere else (e.g. static/, i18n/), the git add list must grow or the PR silently drops files.

Phase 4 — review and merge chore(release): cut vX.Y.Z

Reviewer checklist:

  • Diff is digest pins + image tags only — nothing else.
  • No accidental config drift (a value file you don't recognize).
  • If any chart bumped, check the new digest pulls — crane manifest ghcr.io/cozystack/cozystack/<name>@<digest> should return.
  • Build artifacts on the draft release page exist and match the expected count.
  • Changelog PR exists, has content, and the entries match the commit range (see Changelog pre-publish verification).

Phase 5 — pull-requests-release.yaml (finalize)

Fires on merge of a PR that is merged, carries the release label, and is authored by cozystack-ci[bot] (the last guard closes the "name a branch release-X.Y.Z, get it labelled, merge it" hole). Head branch must match release-X.Y.Z[-suffix]. This is where every irreversible side effect of a promotion happens — after the PR's e2e passed and the PR merged, making promotion transactional. Steps:

  1. Create the tag at the merge commit (write-once). The merge commit of Prepare release vX.Y.Z did not exist before the PR opened, so there is nothing to move — the tag is created here for the first time. A pre-existing tag at a different commit fails the step loudly rather than being force-moved (see Tag immutability).
  2. Cut the api/apps/v1alpha1/vX.Y.Z Go-module tag (write-once, stable only) at the same commit, so Go consumers of api/apps/v1alpha1 get the release. Moved here from tags.yaml, whose prepare-release body is skipped for a promoted stable (the draft already exists).
  3. Ensure the maintenance branch release-X.Y exists at the tag commit. Created if missing; updated fast-forward-only — a non-fast-forward update warns and is left for a maintainer rather than being force-updated.
  4. Publish the draft release. make_latest is computed against published-non-prerelease tags: prereleases stay false; tags older than the current max stay false (and the current max is force-restored to latest if necessary, so an older patch tag cut after a newer minor won't downgrade latest).
  5. Retag the rc images to stable by digest (hack/promote-retag.sh, no rebuild) and publish the stable cozy-installer chart. :latest (on both the images and the chart) moves only when this release's make_latest was true — the same decision as step 4, so the release's latest and the images' :latest never disagree. The chart is packaged with platformVersion stamped into its default values so the documented helm --install --version X.Y.Z path reports the stable version.

Phase 6 — update-releasenotes.yaml (sync GitHub Release body)

Fires on every push to main. Reads each docs/changelogs/vX.Y.Z.md and PATCHes the matching GitHub Release's body if it differs. So edits to a published changelog file land on the GitHub Release on the next push to main, without re-running the release flow.

Stable tags come from rc promotion

A stable vX.Y.Z is created only by promoting an existing release-candidate that already passed e2e — never by rebuilding and never by a cron.

  • promote-rc.yaml is triggered manually once an rc has gone green. It rewrites the rc version substring in the vendored image tags (the digests stay the rc's) and opens the release-X.Y.Z staging PR — no registry mutation. Merging that PR (Phase 5) creates the write-once stable tag at the merge commit, then retags the rc's already-built, e2e-passed image digests to the stable tag by digest (no rebuild — see hack/promote-retag.sh) and publishes the release. Because the copy source is the immutable rc digest, the stable image is bit-for-bit the rc image that passed e2e — and because the retag runs only after merge, an abandoned promotion never leaves stable-named bytes behind.

So a commit on a supported release-X.Y line ships when a maintainer promotes the next rc for that line — not automatically within 24h. Pushing a stable vX.Y.Z tag by hand is not a supported path: tags.yaml fails fast on a stable tag that has no pre-existing draft ("stable tags come from promote-rc.yaml"), and even so the finalize step would refuse to move a pre-existing tag. Pre-releases (vX.Y.Z-rc.N, -alpha.N, -beta.N) are cut with the Cut Pre-release Tag workflow, which pushes the tag as the CI app; tags.yaml then fires on that push, builds it, and publishes the pre-release. Cutting via the workflow (rather than a manual git push) is what lets repo admins lock v* tag creation to the CI app — see the tag-protection note below.

Nightly builds

A nightly is an installable copy of main on GHCR — not a rebuild and not a release. build-main.yaml already builds every push to main into the CI registry (OCIR); the nightly promotes that build to the public release registry (GHCR) and proves it installs.

nightly.yaml runs daily (gated by the NIGHTLY_ENABLED repo variable) as three jobs; build-disk and e2e both start once mirror has finished:

  1. mirror — resolve the exact commit cozystack-packages:main was built from, then hack/nightly-mirror.sh copies every cozystack-owned component image OCIR→GHCR by digest (bit-for-bit, no rebuild) and re-publishes the rewritten cozystack-packages artifact and the cozy-installer chart to GHCR, tagged 0.0.0-nightly.<YYYYMMDD>.<run-id>.<attempt> plus a floating nightly.
  2. build-disk — assemble the Talos nocloud disk from the upstream siderolabs imager (the profile references only ghcr.io/siderolabs/*, so this needs no cozystack image and no rebuild) and publish it as a GHCR OCI artifact (cozystack-nocloud) so a nightly is installable on real hardware. The nightly e2e does not boot it.
  3. e2e — stage the published GHCR closure (rewritten tree + the cozy-installer chart pinned to the GHCR packages artifact) and run the full app suite on Talos containers, which do not boot the disk. A nightly has no diff, so Test Impact Analysis does not apply.

No GitHub release and no api/apps/v1alpha1/* Go-module tag are created for a nightly. retention.yaml prunes old GHCR nightly versions (keeps the newest 14 per package; the floating nightly, release tags and untagged versions are never touched).

Install a nightly:

helm upgrade --install cozystack \
  oci://ghcr.io/cozystack/cozystack/cozy-installer --version 0.0.0-nightly.20260626.15992304129.1
# ...or --version nightly for the latest

The matching Talos node image is ghcr.io/cozystack/cozystack/cozystack-nocloud:0.0.0-nightly.20260626.15992304129.1 (pull with oras).

Backports

The backport bot

backport.yaml wraps korthout/backport-action and fires on a merged main-targeted PR carrying one of:

Label Target branch
backport release-X.Y (current latest minor)
backport-previous release-X.(Y-1)

Resolution is dynamic via getLatestRelease at run time — no need to hardcode branch names.

The bot creates a backport PR with title [Backport release-X.Y] <original title>. When this PR merges, the title prefix used to re-trigger the bot through pr-labeler.yaml, which auto-applied backport to any [Backport release-X.Y]-titled PR. Combined with the org-level dosubot re-applying the label, this caused recursive backports.

The fix (PR #2584): both job if: blocks gate on github.event.pull_request.base.ref == 'main'. Backport PRs target release-X.Y, so they cannot satisfy this — architectural protection, regardless of which bot relabels them.

When the bot fails

Conflicting cherry-picks produce a draft PR via conflict_resolution: draft_commit_conflicts. Look for the bot's comment with the merge-conflict diff. You either:

  • Resolve in the draft branch and undraft, or
  • Drop the bot's branch and cherry-pick manually:
git checkout release-X.Y
git cherry-pick -x -s <commit-sha>
# resolve conflicts
git commit -s
git push origin release-X.Y  # or push to a new branch and open a PR

To find the bot's failed comments across a batch of PRs:

for n in $(gh pr list --search "label:backport label:backport-previous merged:>=2026-01-01" --json number --jq '.[].number'); do
  echo "=== #$n ==="
  gh pr view $n --json comments --jq '.comments[] | select(.author.login == "github-actions" or (.author.login | contains("backport"))) | .body' | head -20
done

Cherry-pick triage before a patch

A patch release includes bugfixes for code that shipped in the corresponding minor vX.Y.0. Use:

# 1. Inventory PRs already labeled for backport (merged but not yet on release-X.Y)
gh pr list --search "is:merged label:backport" --limit 100
gh pr list --search "is:merged label:backport-previous" --limit 100

# 2. List commits on main since the release branch diverged that are NOT yet on release-X.Y
git merge-base origin/main origin/release-X.Y
git log <base>..origin/main --grep="(#" --oneline

# 3. Open PRs that may need labeling before the cut
gh pr list --state open --base main --label kind/bug

Include rule:

  • kind/bug — especially destructive (data loss, crash-loop, OOM, eviction).
  • area/security / CVE.
  • Narrow chart fixes whose blast radius is contained (e.g. one operator's resources).
  • Patch-line-policy-matching dependency bumps (e.g. cilium 1.X.Y → 1.X.(Y+1) on a release-A.B shipping cilium 1.X — never a minor bump, only a patch within the line the branch already ships).

Skip rule:

  • kind/feature — even with lgtm. A patch release is not a delivery vehicle for features.
  • CI-only changes (area/ci, test infrastructure).
  • Docs-only changes (those land via update-website-docs automatically).
  • Large multi-package dependency churn (Dependabot Go-deps bumps).
  • PRs whose conventional-commit type is ! (breaking) or that mix feat with fix.

Borderline cases:

  • Large refactors with lgtm AND an obvious bug payload — prefer extracting the bug fix into a narrower commit and backporting only that.
  • PRs labeled both kind/bug and kind/feature — split them.

Backporting code that touches monotonic counters

Migrations are the canonical case. packages/core/platform/images/migrations/run-migrations.sh is a linear counter — it runs seq $CURRENT_VERSION $((TARGET_VERSION - 1)) and stops if CURRENT >= TARGET. This creates a forward-upgrade trap. Walking through it with release-1.2 as the maintenance branch:

  • main has targetVersion=10 and migrations 1–9 on disk.
  • The release-1.2 branch was cut when targetVersion=5 (migrations 1–4 on disk).
  • You backport a new migration to release-1.2 at slot 5, and naively bump targetVersion 5 → 6 to enable it.
  • Customer running 1.2.x runs the new migration, stamps cozystack-version=6 in-cluster.
  • On upgrade to 1.3 (main's targetVersion=10), the runner walks seq 6 9 and runs main's migrations 6–9 — main's own migration at slot 5 never runs. The backport claimed that slot on release-1.2; main's slot 5 holds an unrelated migration that gets silently skipped.

Mitigations, in order of preference:

  1. Don't bump targetVersion in the backport. Just ship the migration file. Prior precedent in the repo: an earlier maintenance branch's ACME backport did exactly this — the migration shipped but ran on no clusters until a later commit raised the counter. Pair this with relaxing the chart-side {{ fail }} guard on the maintenance branch (chart-side coalesce) so the new value works without the migration having executed.
  2. If you must bump, add an idempotent duplicate of the now-skipped main migration at a higher slot. Bounded cost (one extra file per affected migration) and survives the skip window.
  3. Audit cross-branch counter state before deciding. Compare migration numbering across main, release-X.Y, and release-X.(Y-1). If a backport would create a skip window on any forward-upgrade path, choose option 1.

This rule generalizes to any monotonic-counter state: schema versions, feature-flag generations, anything that gates "have I run X yet?" with a single integer.

Changelogs

Where the canonical process lives

agents/changelog.md is the source of truth. Read it end-to-end before generating; do not infer the process from past commits or memory. The CI runs it under Copilot via tags.yaml::generate-changelog; locally the same prompt is replayable by following the doc directly.

Common changelog failure modes

These are mistakes that have shipped in real changelogs. Verify against each before merging the changelog PR.

1. Commits from outside the release range. Caused by running git log <prev>..HEAD from main while generating a patch changelog — HEAD on main contains everything that landed since the tag plus backports merged to release-X.Y after the tag was cut. Use git log <prev>..<new_tag> explicitly. The doc was updated to require this after v1.3.1's changelog shipped with 14 entries for what was actually a 1-commit release.

2. Original + backport listed as two separate entries. Each backport must coalesce with its original into a single entry of the form (in #orig, backport #bp). To verify after generation:

# Every entry that mentions "backport" should also reference the original PR number
grep -E 'backport #[0-9]+' docs/changelogs/v<new>.md | grep -v '#[0-9]*, backport'

Output should be empty.

3. Wrong PR author. The squash-merge commit's author is whoever clicked "Merge" — not the person who wrote the code. Always resolve via gh pr view <N> --json author --jq .author.login, never git log --format=%an. This bites hardest for website-repo entries where the same merger handles most PRs.

4. Superseding patch, stale changelog. Tags are write-once, so a critical fix after vX.Y.Z ships as the next patch vX.Y.(Z+1) rather than moving the tag. If a changelog PR already exists for a tag you are superseding, the changelog work transfers to the new patch. Compare git log <prev>..<new> against what the existing changelog-vX.Y.Z branch already documents; only add/remove the deltas. If the only new commits are CI-internal or a revert of a feature that never reached a stable tag, no changelog edit is needed.

5. PR numbers swapped inside prose. The entry-format validator checks bullet entries but ignores Feature Highlights paragraphs and Upgrade Notes. Both have caused wrong PR references in shipped changelogs. Verify every #NNNN in prose with gh pr view <N>.

6. Hallucinated entries. Every entry must correspond to a commit in git log <prev>..<new>. Verify by extracting PR numbers from the file and grep-searching the commit range:

grep -oE '#[0-9]+' docs/changelogs/v<new>.md | sort -u | while read pr; do
  n=${pr#\#}
  if ! git log <prev>..<new> --grep="#${n}" --oneline | grep -q .; then
    echo "PR $pr in changelog but not in commit range"
  fi
done

7. Bot accounts as human contributors. cozystack-ci[bot], github-actions, dependabot, renovate, and any app/* login must NOT appear in the ## Contributors list. They legitimately appear in per-entry attribution (e.g. a Renovate-authored PR) — but not in the human roll-call.

8. Title duplicated as description. * **fix(foo): X**: fix(foo): X (...) means you wrote the conventional-commit subject twice and never wrote a user-facing description. The brief and the detail must say different things — the detail explains what the change means for users.

Changelog pre-publish verification

Run these checks before merging the changelog PR. Catches problems in roughly the order they occur:

PREV=v1.2.0; NEW=v1.2.1

# A. Every chart bump is mentioned somewhere in the changelog
git diff --name-only $PREV..$NEW -- 'packages/*/charts/*/Chart.yaml' 'packages/*/*/charts/*/Chart.yaml' | while read f; do
  old=$(git show "$PREV:$f" 2>/dev/null | yq '.version // ""')
  new=$(git show "$NEW:$f" 2>/dev/null | yq '.version // ""')
  if [ "$old" != "$new" ]; then
    component=$(basename "$(dirname "$f")")
    if ! grep -qi "$component" docs/changelogs/$NEW.md; then
      echo "MISSING: $component $old -> $new ($f)"
    fi
  fi
done

# B. Out-of-Chart.yaml pins (Talos, tenant K8s, vendored images)
for path in packages/core/talos/values.yaml packages/core/installer/values.yaml packages/apps/kubernetes/values.yaml; do
  git diff $PREV..$NEW -- "$path" | head -40
done
git diff --name-only $PREV..$NEW -- 'images/*/Dockerfile'

# C. Every cited #NNNN exists and is a merged PR (not an issue)
grep -oE '#[0-9]+' docs/changelogs/$NEW.md | sort -u | sed 's/#//' | xargs -P 20 -I{} sh -c '
  state=$(gh api /repos/cozystack/cozystack/issues/{} --jq ".pull_request.merged_at // \"ISSUE\"" 2>/dev/null)
  echo "#{} $state"
' | grep -E 'ISSUE|null|^#[0-9]+ $'

# D. URL liveness
grep -oE 'https://[^)" ]+' docs/changelogs/$NEW.md | sort -u | xargs -P 10 -I{} sh -c '
  code=$(curl -s -o /dev/null -w "%{http_code}" {})
  if [ "$code" != "200" ]; then echo "$code {}"; fi
'

# E. Website PR authors are PR authors, not commit authors
grep -oE 'cozystack/website#[0-9]+' docs/changelogs/$NEW.md | sort -u | sed 's|cozystack/website#||' | while read n; do
  pr_author=$(gh pr view $n --repo cozystack/website --json author --jq .author.login)
  echo "website#$n -> @$pr_author"
done

# F. Working tree clean except for the changelog
git status --porcelain | grep -v "docs/changelogs/$NEW.md"
# Should output nothing.

Ship criterion: every chart bump surfaced, no issue-cited-as-PR, no 404 URLs, every website entry attributed via gh pr view (not commit author), git status shows only the changelog.

Cozystack-specific URL quirks

cozystack.io paths are versioned: /docs/operations/foo/ and /docs/next/foo/ both 404. Only /docs/vX.Y/foo/ and the unversioned canonical /docs/foo/ serve content. AI-generated changelogs invent the unversioned form. Verify URLs with the curl loop above.

Platform-component coverage

For a minor release (vX.Y.0), changelog entries should surface what an upstream chart bump actually brought in — features, breaking changes, security fixes. PR commit messages usually don't capture this; the upstream CHANGELOG.md or GitHub Release notes do. For each bumped Chart.yaml:

  1. Read the sources: field — typically a GitHub URL.
  2. Fetch release notes strictly inside old < x <= new via gh release view <tag> --repo <owner>/<repo> --json body,name.
  3. Summarize in 2–5 user-impact bullets per component (new features, breaking changes, CVEs, important deprecations). Don't reproduce upstream notes verbatim; link to them.
  4. If a PR-level entry already mentions the bump, enrich that entry with bullets — don't duplicate the entry.
  5. If 3+ bumps have no PR-level mention, introduce a ## Platform Components section.

If you can't find upstream notes for a bumped component, list it with version-only info and no bullets. Hallucinated bullets are worse than missing detail.

Release-time fires — what's gone wrong recently

These are real regressions that escaped to users. The pattern in each: code passed CI, shipped in a stable release, broke customers. Read them as a working list of pre-release verification gaps.

v1.3.0 — cert-manager ingressClassName regression (fix #2562)

Bug: A commit migrated ACME HTTP-01 to use the modern acme.cert-manager.io/http01-ingress-ingressclassname annotation. The matching ingress-shim code that reads that annotation was added by cert-manager upstream PR #8244 and was never backported to the release-1.19 branch — but cozystack 1.3.0 shipped cert-manager v1.19.3. The annotation was silently dropped at runtime and every solver Ingress fell back to the ClusterIssuer's default class tenant-root. Let's Encrypt validation broke for every tenant whose publishing.ingressName != tenant-root.

Blast radius: v1.3.0, v1.3.1, and v1.1.7 (the migration was cherry-picked to release-1.1).

Why CI missed it: the migration commit was self-contained and helm template rendered cleanly. There was no E2E that creates a tenant with a non-default ingress class and watches a real Let's Encrypt cert issue. Verification had been done from the docs side ("the API has been available since cert-manager 1.12"), not against the shipped cert-manager source.

Would have caught it: non-root-tenant E2E with LE-staging cert issuance, asserting the solver Ingress lands on the tenant's class.

v1.4.0 — kubevirt-instancetypes upgrade failure (fix #2612)

Bug: packages/system/kubevirt-instancetypes/Makefile contained sed -i '/persistent: true/d' templates/preferences.yaml, which stripped the only child of preferredTPM, leaving preferredTPM: (null) in six Windows preferences. KubeVirt v1.6.x silently accepted it. The v1.6.3 → v1.8.2 operator bump (2026-04-27) hardened the CRD's OpenAPI schema and started rejecting null for an object-typed field. helm upgrade then failed on every cluster with kubevirt-instancetypes enabled.

Why CI missed it: the kubevirt-operator bump and the inert preferences.yaml were two weeks apart in commit history. CI only tests fresh installs against the new CRDs; it doesn't run helm upgrade from prior versions. Schema regression on a vendored asset that hadn't been touched in 18 months.

Would have caught it: helm template <new chart> | kubectl apply --dry-run=server -f - against the freshly-installed CRDs of every bumped operator. Or an upgrade-from-N-1 E2E lane.

v1.4.0 — Flux 2.7 → 2.8 readiness deadlock (#2602)

Bug: helm-controller v1.5.0 (shipped in Flux 2.8) changes the default wait strategy to kstatus polling, which polls every applied resource including child HelmReleases. The packages/apps/kubernetes umbrella has 19 child HRs that each dependsOn: parent (with a lookup guard so the dependency only activates after the parent exists). Pre-2.8: parent went Ready as soon as Helm returned. Post-2.8: parent waits for children, children wait for parent. Deadlock.

Why CI missed it: the cycle only manifests on the second reconcile (parent exists, so the lookup activates the child's dependsOn). Fresh-install E2E dodges this — the parent-already-exists branch isn't taken on the first apply.

Would have caught it: apply-mutate-reapply E2E (any chart bump in the kubernetes umbrella triggers a second reconcile). Plus an explicit PR-template requirement: for any flux/helm-controller bump, paste the upstream breaking-changes section into the PR body.

Patterns these share

  1. Fresh-install CI is insufficient. All three regressions passed fresh-install lanes.
  2. Upstream breaking-defaults bumps are the common shape. kubevirt CRD hardening, helm-controller default wait strategy, cert-manager API surface drift. Pre-merge reading of upstream changelogs would have caught two of three.
  3. One-engineer-bitten-once is the only safety net for live verification. The cert-manager bump PR included an explicit live-cluster verification step — because the same engineer had been bitten the prior week. There is no checklist requiring it.

Pre-release verification checklist

For RCs and final releases, run this before merging the release PR. Each item is here because something has shipped without it and broken users.

  • Upgrade from previous patch (vX.Y.(Z-1)) on a real cluster. helm upgrade succeeds, all HelmReleases reach Ready, no CRD schema rejections.
  • Upgrade from previous minor (v(X-1).Y.0) for RC and minor releases. Same assertions.
  • At least one tenant with publishing.ingressName != tenant-root and a real Let's Encrypt-staging cert issuance.
  • Apply-mutate-reapply on the kubernetes umbrella HelmRelease (catches second-reconcile bugs).
  • For every CRD-source bump (kubevirt, cert-manager, flux, cilium, kamaji): helm template | kubectl apply --dry-run=server against the freshly-installed CRDs.
  • For every flux / helm-controller / kubevirt-operator / cert-manager bump: paste the upstream breaking-changes section of the bump's CHANGELOG into the PR body before merge.
  • After cutting the tag, watch pull-requests-release.yaml::Finalize Release. If it fails on Draft release for v... not found, undraft the release manually and file the workflow regression — this has been a known recurring failure since the Publish draft release step lost its explicit github-token in refactor 66a756b6.
  • Changelog PR exists and was verified per Changelog pre-publish verification.

CI failures release engineers commonly hit

Symptom Class Diagnosis Block release?
Draft release for vX.Y.Z not found on every release-* merge Workflow regression — Publish draft release lost its github-token in a past refactor; default GITHUB_TOKEN cannot list drafts At pull-requests-release.yaml:163. Undraft manually, file the fix No
Changelog Copilot job returns 402 Token quota — COPILOT_GITHUB_TOKEN premium-request quota empty All tag CI runs that day fail the changelog phase No — continue-on-error: true, generate changelog by hand following agents/changelog.md
E2E kubernetes-test fails with CSINode does not contain driver csi.kubevirt.io Test ordering bug Tenant's kubernetes-${test_name}-csi HelmRelease still installing when NFS PVC is created. Fix: wait for csinode/<node> to advertise the driver before creating the PVC Yes — flaky and masks real CSI bugs
tenant-root HR in perpetual upgrade-rollback loop after OIDC patch Real bug at the intersection of #2602's readiness change and the cozystack reconcile cadence Look for rate: Wait(n=1) would exceed context deadline in operator logs; multiple tenant child HRs stuck InProgress Yes
cozy-dashboard ImagePullBackOff from cozystack-ui:latest Registry flake Known noisy on some OCI mirrors; not currently in the prepull set No — retry
PR CI: docker push 409 on :latest for the same image across two PRs Concurrent manifest race on a shared floating tag The :latest tag was previously written by every make image regardless of PR. Resolved by the image-tag refactor (IMAGE_TAG=pr-<N>-<sha> in PR builds, IMAGE_TAG=<ref_name> only at release time) No — gh run rerun --failed

Heuristic: workflow-token and Copilot-quota issues are out-of-band — release the tag, fix the workflow in a follow-up PR. Test ordering bugs and tenant-root reconcile storms are real and should block.

If you find yourself doing the same manual fixup on two consecutive releases (e.g. "undraft the release"), open a workflow-regression issue. Workflow bugs with known manual workarounds rot silently for months.

Tag immutability

Published tags are write-once — once a vX.Y.Z or rc tag is pushed it is never moved or deleted. (Nightlies are not git tags at all — they are GHCR OCI tags, see Nightly builds.) Moving a tag silently poisons the Go module proxy / pkg.go.dev cache for api/apps/v1alpha1/vX.Y.Z and drifts SBOM/provenance toolchains, so the release flow is built so a move is impossible by construction:

File Tag / branch handling
pull-requests-release.yaml Creates vX.Y.Z at the PR merge commit write-once (create if absent, no-op if unchanged, fail loudly if it would move — the merge commit is new, so there is nothing to move). Cuts the api/apps/v1alpha1/<vTAG> Go-submodule tag write-once at the same commit, stable only (never rc/beta/alpha). The release-X.Y maintenance branch is fast-forward-only. Retags the rc image digests to the stable image tag (also write-once at the image level).
tags.yaml The release-X.Y.Z-rc.N staging branch is a mutable staging ref (compare-before-force: skipped when unchanged, force+log only when it genuinely moves). Fails fast on a stable vX.Y.Z tag with no pre-existing draft — stable tags come from promote-rc.yaml, never a hand push.
promote-rc.yaml Mutates no tags. Stages the release-X.Y.Z branch and opens the promote PR; the stable tag and the image retag both happen at merge (finalize).

This is the immutable-tag + rc-promotion model from #2677: stable vX.Y.Z is created only by promoting an existing rc, rc tags are write-once, and api/apps/v1alpha1/vX.Y.Z is created only on a stable release. The old nightly auto-release.yaml (which delete-recreated auto-bumped patch tags) has been removed. rc and stable tags accrete permanently; the only churning artifacts are GHCR nightlies, which retention.yaml prunes (see Nightly builds) — GHCR storage is the cost vector to watch.

Repo-side enforcement (tag-protection rulesets)

The guarantees above are enforced in the workflows. Repo admins back them with two GitHub tag rulesets targeting v*:

  • Immutability — Restrict updates + Restrict deletions, no bypass. No actor (not even the CI app) can move or delete a shipped v* tag. Safe to enable at any time: nothing in the release flow ever moves or deletes a v* tag, it only creates new ones.
  • Creation control — Restrict creations with the CI app as the sole bypass actor, plus Limit branches/tags updated in a single push = 1. This turns "don't hand-push tags" from convention into hard enforcement: every v* tag — pre-release and stable — can then be created only by CI. Enable this only after cut-prerelease.yaml is in use, since that workflow is what makes CI the sole creator of pre-release tags; enabling it earlier would lock maintainers out of cutting rc/alpha/beta. (The Go-module tag api/apps/v1alpha1/* gets an equivalent pair of rulesets.)

Splitting a release-blocking bundle PR

Sometimes the work that has to land before a release is a 40-commit grab bag (CI stabilization, dependency bumps, chart fixes). Splitting it makes it reviewable and survivable. The strategy that has worked:

  1. Verify what's already on main. Use git merge-base --is-ancestor and subject grep to drop commits that have already landed.
  2. Find existing open PRs that cover the same commits. Force-push to the existing branch instead of opening a duplicate — preserves review threads.
  3. Identify the "bottleneck" PR. The one whose changes make previously-silent misconfigurations into hard errors (typically an operator-version bump). Everything else can fan out in parallel.
  4. Squash iterative same-author bug-on-bug fixes inside each split. Preserve authorship via --author on the squashed commit.
  5. Mark the keystone PR as draft and link in the body to the dependency PRs. Reviewers know it intentionally fails CI until the chain lands.
  6. Beware of concurrent registry pushes. When fanning out 5+ PR CI runs simultaneously, multiple make image jobs can collide on shared floating tags. The IMAGE_TAG=pr-<N>-<sha> refactor solved this; if you see Conflicted with another upload of the same manifest, gh run rerun --failed.

Cleanup after release

  • The release-X.Y.Z branch is deleted by GitHub when its PR merges. The release-X.Y maintenance branch is created/updated by pull-requests-release.yaml::Ensure maintenance branch.
  • The draft release is published by the same workflow.
  • The update-releasenotes.yaml workflow syncs docs/changelogs/vX.Y.Z.md into the GitHub Release body on the next push to main. Edits to a published changelog file land on the release page the next time main moves.
  • Local cleanup: remove your worktree (git worktree remove) and prune merged release branches.

See also