Myasnikov Daniil c46037ce7b fix(ci): stop a cancelled run from wedging the "E2E Tests" gate
Now that the required "E2E Tests" context is a commit status rather
than a job, a run that dies before posting leaves the head SHA at
"Expected" — which blocks the merge instead of passing it. Two paths
reached that state.

Same-repo: a `labeled` event shared the PR's concurrency group, so
labelling an open PR cancelled the live opened/synchronize run, and
the replacement run was then discarded by `plan`'s full-e2e guard --
so `e2e-report` skipped with it and nothing posted the status the
cancelled run was going to. Observed on live CI: run 30614258694
(cancelled) followed by 30614280603 (skipped) on the same SHA, 24s
apart, from a maintainer adding kind/* labels just after a push.
Label events now get their own concurrency group, so they can only
supersede each other. Release promotion is unaffected: `gh pr create
--label` attaches `release` at creation, so a promote PR gets a
single run that already sees the label (verified on #3397 and #3425,
one run each, build/finalize gated off).

Fork: `resolve` had no equivalent, so a cancelled triggering run fell
through to the `CONCLUSION != 'success'` branch and posted `failure`
— a false red on a SHA whose e2e never ran, which the replacement run
for that same SHA would not flip back (it takes the discarded-label
path and posts nothing). It now returns early on a cancelled or
wholly-skipped conclusion. Checked on the conclusion rather than the
job list because a cancelled run can report no jobs at all, which
would make the `Plan build` lookup miss.

Both stay fail-closed: declining to post can only preserve a verdict
a real run reached, never invent one.

Assisted-By: Claude <noreply@anthropic.com>
Signed-off-by: Myasnikov Daniil <myasnikovdaniil2001@gmail.com>