mirror of
https://github.com/ruvnet/ruflo.git
synced 2026-11-24 06:06:02 +09:00
End-to-end test that proves the iter-10 + iter-11 + iter-12 work
compose into a working pipeline. 25 assertions across four phases:
PHASE 1 — synthesize realistic JSONL trajectory
- 40 paired decisions with SER beating bandit by ~5% quality, +0.5%
cost, +1% latency (the promotable fixture)
- Verifies JSONL shape matches the iter-11 recorder's output schema
PHASE 2 — verify recorder TS module exports
- recordPair / recordPairOutcome / parallelRecorderStatus all
exported with correct signatures
- CLAUDE_FLOW_ROUTER_PARALLEL_LOG env gate present in source
- "never throws" doc invariant present (ADR-150 rule #3)
- appendFileSync wrapped in try/catch
PHASE 3 — run analyzer against fixture
- Analyzer exits 0 with valid JSON output
- sampleSize, disagreement.pct present and correct
- All 3 criteria computed (qualityImprovementPct / usdIncreasePct /
latencyIncreasePct)
- The 3 ADR-150 review-round-1 thresholds EXACTLY: 2 / 1 / 5
- All three criteria pass on the promotable fixture
- verdict.promotable === true
PHASE 4 — verify --strict semantics
- --strict on promotable fixture exits 0
- --strict on synthesized NON-promotable fixture (quality only +0.5%)
exits 1
This isolates the recorder + analyzer composition from the model-router
.ts build state — the iter-12 dispatch wiring is covered separately by
smoke step 17f's source-grep. Together they form complete coverage of
the ADR-150 parallel-logging pipeline.
WIRED INTO CI
- metaharness-ci.yml router-compat job now runs the e2e test as its
final step. Failure here means the recorder schema drifted from the
analyzer expectations, or the ADR-150 thresholds were silently
modified — both regressions worth blocking the PR for.
Smoke: 22 → 23. Fleet: 33/33.
Co-Authored-By: RuFlo <ruv@ruv.net>