Files
ruflo/v3/docs
ruv 2a06c3e2bf feat(metaharness): wire recordPair() into model-router.ts route() — ADR-150 last mile (iter 12)
The dispatch-side edit that closes the SelfEvolvingRouter parallel-
logging pipeline. ADR-150 status: Implemented.

THE EDIT
- Lazy-loader for router-parallel-recorder added beside the existing
  router-trajectory + neural-router lazy loaders (same pattern).
- One fire-and-forget call inside the existing if (abEnabled) block,
  beside the A/B disagreement counter. Env-gated:

    if (process.env.CLAUDE_FLOW_ROUTER_PARALLEL_LOG === '1') {
      loadParallelRecorder().then(mod => {
        try { mod.recordPair({task, bandit, ser}); } catch {}
      }).catch(() => {});
    }

  Both arms tagged at the call site:
    bandit.backend = 'thompson-bandit'
    ser.backend    = neuralPrior
                     ? 'metaharness-router-hybrid'
                     : 'bandit-only'

ZERO DEFAULT-PATH OVERHEAD
The env flag is OFF by default. Without it set:
  - process.env lookup: one string compare on each route() call
  - loadParallelRecorder() never invoked
  - dynamic import never resolved
  - No filesystem I/O
  - No JSON serialization
The routing hot path is byte-identical to before iter 12 when the
env flag is unset.

ADR-150 ARCHITECTURAL CONSTRAINTS (preserved)
  #1 Removable — recordPair is dynamic-imported lazily; the .catch()
     on the import promise means a missing @metaharness/kernel never
     surfaces to the routing path.
  #2 Optional — env-gated, off by default; no static import added.
  #3 Graceful degradation — try/catch around recordPair, .catch() on
     import promise. The routing decision NEVER blocks or throws
     because of the recorder.
  #4 CI gate — smoke step 17f asserts the call site, env gate, lazy
     loader, both arm tags, and try/catch presence.

END-TO-END PIPELINE NOW WIRED
  route() → recordPair() → .swarm/router-parallel.jsonl
                          → router-parallel-analyze.mjs
                          → 3-criteria AND-gate verdict

ADR-150 STATUS UPDATE: Accepted → Implemented
All Phase 1 + Phase 2 items shipped across 12 /loop iterations. The
only outstanding work is the KRR retrain from production trajectory
data — explicitly noted as pending in the status field.

Smoke: 21 → 22. Fleet: 33/33. tsc clean.

Co-Authored-By: RuFlo <ruv@ruv.net>
2026-06-16 14:10:16 -04:00
..