mirror of
https://github.com/ruvnet/ruflo.git
synced 2026-11-24 22:28:10 +09:00
Eight /loop iterations shipped Phase 1 + most of Phase 2. The ADR
status now reflects reality:
Status: Proposed → Accepted (Phase 1 shipped iters 1–3, Phase 2
partially shipped iters 4–8)
ADDED "IMPLEMENTATION NOTES" SECTION with per-phase status:
Phase 0 — Measurement spike ✅ DONE (iter 1)
- Ruflo baseline scorecard captured (harnessFit 82, risk_score 0.27)
Phase 1 — MVP ✅ DONE (iters 1–3)
- plugins/ruflo-metaharness/ with 6 skills (5 + harness-oia-audit
lifted forward from Phase 2 in iter 7)
- Shared _harness.mjs subprocess bridge
- npx ruflo metaharness <subcommand> top-level dispatcher
- metaharness@~0.1.11 + @metaharness/router@~0.3.2 in
optionalDependencies of BOTH @claude-flow/cli AND ruflo wrapper
- 3 CI workflows: metaharness-ci.yml + no-metaharness-smoke.yml +
check-metaharness-compat.mjs tripwire (9/9 against 0.3.2)
Phase 2 — Expansion (3 of 4 shipped)
✅ npx ruflo eject (iters 4–5)
✅ 'harness' PluginType in plugin registry (iter 6)
✅ harness-oia-audit composite worker + weekly cron (iter 7–8)
🔄 SelfEvolvingRouter parallel-logging — deferred to follow-up ADR
Phase-1 item #3 — Real seed corpus retraining 🔄 PENDING
Pipeline is wired but needs production trajectory data. Plan:
enable CLAUDE_FLOW_ROUTER_TRAJECTORY=1 on next main release,
collect a week of data, retrain via train-bundled-krr.mjs.
ARCHITECTURAL INVARIANT QUOTED
The single non-test source file with a static @metaharness/* import
is v3/@claude-flow/cli/src/ruvector/neural-router.ts (dynamic import,
triple-gated). Everything else reaches MetaHarness via the
_harness.mjs subprocess bridge. no-metaharness-smoke.yml enforces
this with both static grep AND runtime drill.
Co-Authored-By: RuFlo <ruv@ruv.net>