mirror of
https://github.com/ruvnet/ruflo.git
synced 2026-11-24 06:06:02 +09:00
Closes the gap iter 47 revealed: the schema-shape bug shipped in iter 38 hid for 9 iterations because no CI surface exercised the real metaharness CLI → fingerprint → similarity chain. The `similarity-tests` job deliberately runs WITHOUT @metaharness/* (constraint #1: works without). That's the right gate for "ruflo stays operational" — but it can't catch the OTHER class of bug: "ruflo stays SEMANTICALLY CORRECT when the dep IS installed." This iter adds the missing gate. NEW CI JOB: metaharness-real-data .github/workflows/metaharness-ci.yml — 3 steps, ubuntu-latest, 10-min cap: 1. Pre-flight — `npx -y metaharness@latest --version` Warms the package cache so the roundtrip's 90s timeout doesn't expire on cold start. 2. End-to-end pipeline roundtrip — `node test-pipeline-roundtrip.mjs` Must exit 0. Exit 2 (test-cannot-run) means cache warmup failed (= infra failure). Exit 1 (assertion failed) means the load-bearing self-match invariant overall===1 didn't hold — that's exactly the schema-shape regression iter 47 fixed. 3. Cross-check — score subcommand via the iter-42-fixed dispatcher Confirms the CLI surface stays aligned with what oia-audit consumes internally. If a future upstream version renames `harnessFit` → something else, this catches it independently of the roundtrip. DRY-RUN-LOCALLY (all 3 steps green) step:warmup OK (metaharness 0.1.14) step:roundtrip exit=0 (15/15 pipeline assertions) step:cross-check OK (harnessFit present in dispatcher output) WHAT THIS JOB CATCHES THAT THE OTHERS DON'T similarity-tests job — runs WITHOUT @metaharness/*, uses synthetic fixtures ✓ proves architectural constraint #1 (works without dep) ✗ misses: schema-shape contracts, runHarness vs runMetaharness drift metaharness-real-data job — runs WITH @metaharness/* installed ✓ catches: schema drift between upstream CLI and similarity module ✓ catches: oia-audit binary selection (iter 47-fixed bug) ✓ catches: dispatcher consumes the right CLI's output shape Both jobs run on every PR touching plugins/ruflo-metaharness/. The pair covers BOTH semantic contracts: - "ruflo stays operational when dep is absent" (constraint #1) - "ruflo stays correct when dep is present" (iter 48) SMOKE STEP 17z11 anchors the new job: - workflow file exists + has the job header - pre-flight, roundtrip, and cross-check steps present - all step names guarded against silent deletion GATES THIS ITER smoke: 51 → 52 (step 17z11 green) fleet: 33/33 yaml: python yaml.safe_load passes dry-run: all 3 new steps green locally ITERS 47-48 ARC COMPLETE — the deep-integration story now has the acceptance gate it was missing for 12 iterations. Co-Authored-By: RuFlo <ruv@ruv.net>